Heating without gas in Vienna: what does the ground say at your address?
Neither Austria’s Renewable Heat Act nor Vienna’s building code sets a date by which an existing gas heating system has to be replaced. Anyone who wants to switch finds in the City’s energy maps what the ground says about a heat pump — as a map of restrictions, not of suitability. The City funds the switch with 35 % of the cost, depending on the budget.
In short: The City’s geothermal map is green on 54 % of Vienna’s area and yellow on 46 %; a geothermal borehole needs a water-law permit on 77 % of the area, a groundwater heat pump everywhere. A groundwater body suitable for thermal use lies beneath 62 % of the city. Of the 1,108 funded heat pumps in the City’s register, 754 take their heat from the air — none of these maps applies to them.
What do the maps say at your address?
The address goes to the City of Vienna address service for the search, never to Vienna Living Map. The result stays on this device. No account.
What the City’s energy maps show
The City of Vienna publishes its energy maps as open data. Four of them matter for a heat pump: the map for geothermal boreholes with the water-law permit zone and the thermal conductivity of the ground, the map for groundwater heat pumps with the output class per pair of wells and the groundwater bodies suitable for thermal use, the sewers for waste-water heat and the climate protection areas of the energy spatial plans.
Green, according to the City, means use generally possible. Yellow: further information needed. Magenta: use generally not possible. Where several restrictions overlap, the map shows the strictest. How much heat can actually be gained is not part of the map, above all for groundwater; underground car parks and other underground structures are not fully known to it. City of Vienna, geothermal cadastre
Shares of the area each map covers; own calculation from the City’s maps, retrieved 13 October 2026.
Three points, three answers
Azima shows the same short form at every address under “Heating without gas” — here at three points:
- Geothermal borehole
- Map green · permit needed
- Groundwater heat pump
- Map green · 5 kW bis < 20 kW per pair of wells · local aquifer
- Waste-water heat
- no sewer within 100 m · the nearest about 220 m away
- Climate protection area
- no
- Geothermal borehole
- Map green · permit needed
- Groundwater heat pump
- Map green · 1 kW bis < 5 kW per pair of wells · no suitable groundwater body
- Waste-water heat
- no sewer within 100 m · the nearest about 150 m away
- Climate protection area
- no
- Geothermal borehole
- Map green · permit needed
- Groundwater heat pump
- Map green · > 20 kW per pair of wells · productive aquifer
- Waste-water heat
- no sewer within 100 m · the nearest about 1,010 m away
- Climate protection area
- yes (22/026/1) — applies to new buildings only
In Grinzing the groundwater map is green, yet no groundwater body suitable for thermal use lies there. That is why Azima always reads the map, the output class and the groundwater body together — the map colour alone does not say so.
What applies — and what does not
- New buildings have not been allowed fossil heating since 29 February 2024 (federal Renewable Heat Act). City of Vienna, energy spatial plans
- In the climate protection areas of the energy spatial plans, heating and hot water in new buildings may only use energy from renewable sources, efficient district heating or carbon-free sources; existing buildings are not affected. According to the City, a climate protection area is still a sign that district heating is well available. City of Vienna
- Whoever converts a building, carries out a major renovation or changes the heating system has to cover the energy demand from renewable sources, efficient district heating or carbon-free sources, as far as that is technically, functionally and economically feasible; a qualified person checks this (§ 118c of the building code, in this version since 15 July 2026, in substance since 2023). RIS
- Merely replacing the gas boiler in a flat with a newer appliance does not change the heating system, according to the explanatory notes to the building code. Vienna Parliament, 26 June 2026
- New oil or coal heating is not permitted in a renovation or a change of the heating system (§ 118c (6)).
- An official date on which gas ends in an area or at an address could not be found as of 13 October 2026. The Vienna Heat Plan 2040 shows which heat supply is best suited in which area; according to the City it is non-binding. City of Vienna
- A groundwater heat pump always needs a water-law permit in Vienna; a geothermal borehole needs none in the west of the city and one everywhere else — it has to be reported everywhere. City of Vienna, water-law permit
- Whether a district heating connection is possible is checked case by case by Wien Energie. City of Vienna
What the City pays for the switch
The City (MA 50) funds the switch to a high-efficiency alternative heating system in your main residence with 35 % of the recognised cost, at most 5,250 euros in a flat and at most 8,000 euros in a single-family house, where geothermal, groundwater or waste heat adds 4,000 euros and income limits apply; the old system has to be removed and the new one has to be the only heating. Whoever frees the flat from gas entirely and cancels the gas connection can also get a decarbonisation bonus of usually 1,000 euros, 1,500 euros if the whole building switches. In apartment buildings, wohnfonds_wien funds at most 50 euros per m² of floor area, at most 80 euros with geothermal, groundwater or waste heat, plus 4,000 euros per connected flat, capped at 35 % of the cost, applied for before construction starts. Payment depends on the available budget and there is no legal entitlement; the federal boiler-replacement scheme takes no more applications for 2026, the environment ministry has announced 179 million euros for 2027, and the conditions had not been published as of 13 October 2026 (as of October 2026).
Sources, retrieved 13 October 2026: MA 50, heating systems, decarbonisation bonus, wohnfonds_wien, federal renovation scheme, environment ministry, 13 July 2026. The same line, with its date, is in Azima under “Heating without gas”.
Funded installations by district
The City keeps registers of funded installations: 1,108 heat pumps (built 2016 to 2023), 6,088 solar power and 2,844 solar thermal systems. Of the heat pumps, 754 work with the outside air (air-to-water), 278 with ground heat via brine (brine-to-water) and 76 with water as the heat source (water-to-water). Funded heat pumps per 1,000 buildings are most common in Margareten (14.4), Donaustadt (8.5) and Penzing (8.2), least common in Mariahilf (0.0).
Counted per district, never a single house. Installations without funding are missing from the registers; the heat-pump register runs to 2023, the solar thermal one to 2021. Buildings: City of Vienna roof model (LOD2.1).
Frequently asked
Do I have to replace my gas heating in Vienna?
Neither the federal Renewable Heat Act nor Vienna’s building code sets a deadline for existing gas heating. Whoever converts a building, carries out a major renovation or changes the heating system has to cover the energy demand from renewable sources, efficient district heating or carbon-free sources, as far as that is technically, functionally and economically feasible (§ 118c of the building code, in this version since 15 July 2026). According to the explanatory notes, merely replacing the gas boiler in a flat is not such a change.
When will gas be switched off in Vienna?
No official date for an area or an address could be found as of 13 October 2026. The Vienna Heat Plan 2040 shows which heat supply is best suited in which area; according to the City it is a non-binding instrument. The City’s goal: by 2040, space heating and hot water in Vienna’s buildings are to come exclusively from renewable sources.
What does the City’s geothermal map show?
Known restrictions, not suitability: green means “use generally possible”, yellow “further information needed”, magenta “use generally not possible”; where several restrictions overlap, the map shows the strictest. How much heat can actually be gained is not part of it. Across Vienna, 54 % of the area is green.
Do I need a permit for geothermal or groundwater heat?
For a groundwater heat pump, always. For a geothermal borehole on 77 % of the city’s area; in the west of Vienna it needs no water-law permit, but it still has to be reported there.
What funding is there in Vienna for replacing the heating?
The City (MA 50) funds the switch to a high-efficiency alternative heating system in your main residence with 35 % of the recognised cost, at most 5,250 euros in a flat and at most 8,000 euros in a single-family house, where geothermal, groundwater or waste heat adds 4,000 euros and income limits apply; the old system has to be removed and the new one has to be the only heating. Whoever frees the flat from gas entirely and cancels the gas connection can also get a decarbonisation bonus of usually 1,000 euros, 1,500 euros if the whole building switches. In apartment buildings, wohnfonds_wien funds at most 50 euros per m² of floor area, at most 80 euros with geothermal, groundwater or waste heat, plus 4,000 euros per connected flat, capped at 35 % of the cost, applied for before construction starts. Payment depends on the available budget and there is no legal entitlement; the federal boiler-replacement scheme takes no more applications for 2026, the environment ministry has announced 179 million euros for 2027, and the conditions had not been published as of 13 October 2026 (as of October 2026).
Is there district heating at my address?
Whether a connection is possible is checked case by case by Wien Energie; an open register of the network could not be found as of 13 October 2026. If the address lies in a climate protection area, the City calls that a sign that district heating is well available — no more than that.
Can heat be taken from the sewer?
The City lists 5,845 sewer sections with at least 15 litres per second of dry-weather flow, about 320 km in all, as a first orientation. Whether a sewer can be used is decided case by case; according to the City, waste-water heat suits large or several buildings rather than one.
Do these maps matter for an air-source heat pump?
No — the maps are about boreholes, groundwater and sewers. An air-to-water heat pump takes its heat from the outside air; 754 of the 1,108 funded heat pumps in the City’s register work that way. Which rules apply to the outdoor unit is not covered on this page.
Solar potential per roof · Green roof potential · What the house still allows · EV charging
Sources: City of Vienna energy maps — geothermal borehole and thermal groundwater use maps, geothermal potential, thermal groundwater potential map, suitable groundwater bodies, waste-water heat potential, funded heat pumps, solar power and solar thermal systems (data.gv.at, CC BY 4.0, retrieved 13 October 2026; data source: Stadt Wien – data.wien.gv.at); District boundaries and roof model: City of Vienna (CC BY 4.0); law: RIS and wien.gv.at; funding: wien.gv.at, wohnfonds_wien, sanierungsoffensive.gv.at. No legal advice and no planning — the maps replace neither a specialist nor a permit.